The axis diplomat Bill of Materials (BOM) module provides for the maintenance of the lists of components and sub-assemblies required to make the stock items manufactured by the company. The resultant database can be used to print parts explosions (i.e. kit lists) and where-used lists, as well as detailed assembly costings. The BOM database is also used by the Material Requirements Planning (MRP) module.

 

2.1 Assemblies and Sub-assemblies

These are products which are made, usually in house, from a list of components. An assembly is an item which is never used in any other assembly; it is a finished stock item which can be sold. A sub-assembly is an assembly which is also used as a component in one or more other larger assemblies. It may also be a saleable stock item, e.g. a spare part, or it may be purely internal and only ever exist on the shop floor as work in progress.

 

2.2 Components

A component in a Bill of Materials may be classified as one of the following:

  • Material
  • Operation
  • Other Cost

A component may also be a sub-assembly and made up of other components. All components and sub-assemblies have a two line description and, optionally, an additional specification

Material components may be further classified as Stocked, Resaleable, Bought In or Manufactured.

Stocked materials are those for which stock levels are maintained. Resaleable materials are those items which are sold to customers and therefore have trade and retail pricing information.

Bought in materials are purchased, as required, from external suppliers. A bought in assembly item implies an assembly which is manufactured under sub-contract.

Manufactured materials are those assemblies and sub-assemblies that are made in house from their components.

 

2.3 Overhead Costs

The system caters for overhead costs, sub-contract costs and other user defined costs.

Overhead costs can be specifically defined for an assembly or they can be specified as a percentage overhead cost rate against materials (e.g. for handling), labour rates, machines and/or operations (e.g. heat, light and floor space) as required.

Sub-contract and other user defined costs can be set up and included in the BOM for costing purposes only.

 
 

2.4 Batch (or recipe) Costing

A costing batch quantity (i.e. a recipe quantity) can be specified for assemblies which are costed to make a batch quantity of the assembly rather than a single item.

This batch quantity may, or may not, be the same as the `quantity to make' (i.e. the manufacturing batch quantity). Its purpose is to enable the accurate specification and costing of ‘trace’ ingredients required to make the assembly. All requirements for quantities actually being manufactured will be automatically scaled up or down by the MRP module.

 

2.5 Costing Reports

Parts explosions can be printed showing current or standard costs to four decimal places. Percentage overheads can be included or excluded as required and percentage margins calculated against trade or retail prices.

 

2.6 Rolled Up Costing

Assembly and sub-assembly costs can be re-calculated from the component costs, including operation costs (if present), at any time, for inspection only or as a permanent update. The calculated rolled up cost can also, optionally, include any percentage overhead costs defined for the components. The roll up costings can be applied to current cost or to the standard cost figures held for each item.

 

2.7 Material Requirements Planning and Manufacturing

The Bill of Materials module information is also used as the basis for The axis diplomat Material Requirements Planning module.

Material Requirements Planning provides the ability to forecast the demand for materials required by manufacturing. This demand is automatically calculated based on the number and variety of customer sales orders plus any internal works orders for stock based on sales projections.

Provisional planning (i.e. trial kitting) provides a powerful `what if' requirements analysis. Material scheduling generates works orders and purchase requirements for planned orders.

 Printer Friendly Version

 View PDF

< Accounts

Compact Material Requirements Planning >

Call Back
This site uses cookies. By continuing to access this site you are accepting the use of cookies by this site.
Read more about cookies...
OK

Cookies are small text files stored on your device when you access most websites on the internet.

This Website uses cookies in order to make the Website easier to use, to support the provision of information and functionality to you, as well as to provide us with information about how the Website is used so that we can make sure it is as up to date, relevant and error free as far as we can. Further information about the types of cookies that are used on this Website is set out in the box below.

By using this Website you agree to our use of cookies. You can choose to restrict or block cookies set on the Website through your browser settings at any time. For more information about how to do this, and about cookies in general, you can visit www.allaboutcookies.org. Please note that certain cookies may be set as soon as you visit the Website, but you can remove them using your browser settings.

However, please be aware that restricting or blocking cookies set on the Website may impact the functionality or performance of the Website, or prevent you from using certain services provided through the Website. It will also affect our ability to update the Website to cater for user preferences and improve performance.

We don’t sell the information collected by cookies, nor do we disclose the information to third parties, except where required by law (for example to law enforcement agencies).

We may sometimes embed content from 3rd party websites such as YouTube. As a result, when you visit a page containing such content, you may be presented with cookies from these websites. We do not control the dissemination of these cookies and you should check the relevant third party's website for more information.

Cookies We Use

Cookie Description
CookieConfirm The presence of this cookie is used to remember the fact that you have confirmed that you are happy to accept cookies
ASPSESSIONIDxxxxxxxx This is a Session Cookie (session cookies are temporary and are erased when you close your browser). It identifies you from one page to the next and is used, for example, to keep track of your logged-in status.
UserID, account, password These cookies are used to remember your login credentials for when you next visit our website. They are only created if you choose the “Remember Me” option on the login page.
_utma, _utmb, _utmc, _utmz These are cookies created by Google Analytics and are used to provide us information on which web pages are the most popular, and the most popular search terms used by visitors arriving at our site.